Search
Email a friend
  • To include more than one recipient, please separate each email address with a semi-colon ';', to a maximum of 5

  • By submitting this article to a friend we reserve the right to contact them regarding AMM subscriptions. Please ensure you have their consent before giving us their details.


Borusan mill may start ahead of schedule

Sep 06, 2013 | 02:54 PM | Michael Cowden

Tags  Borusan Mannesmann Boru Sanayi ve Ticaret, Buddy Brewer, Borusan Mannesmann Pipe US, oil country tubular goods, OCTG, trade case, line pipe, threading pipe mill


CHICAGO — Construction of Borusan Mannesmann Boru Sanayi ve Ticaret AS’ oil country tubular goods (OCTG) and line pipe mill in Baytown, Texas, is ahead of schedule.

Buddy Brewer, chief executive officer of Houston-based Borusan Mannesmann Pipe US Inc., told AMM Sept. 6 that threading operations should be completed by late November or early December, with the pipe mill potentially running ahead of a planned April 2014 start up. Heat-treatment operations are officially slated to get under way in July 2014, "but we expect it to be well ahead of that," he said.

The $150-million, 300,000-ton-per-year facility had been expected to be completed in the third quarter of 2014 (amm.com, June 5).

The project is moving along thanks to an "outstanding performance" by employees and contractors as well as good weather, Brewer said. "It’s been an extraordinarily quiet tropical storm season so far and a dry summer. Texas is still in drought conditions. That’s terrible for farmers and everyone else, but it’s great for construction."

The Baytown mill will produce OCTG in American Petroleum Institute (API) grades N80 through Q125, as well as in custom-engineered grades, and is expected to displace about 85 percent of Turkey’s exports of the products to the United States (amm.com, July 30).

Istanbul, Turkey-based Borusan Mannesmann was eyeing Texas for the new mill months before Turkey was targeted in a broad trade petition filed by domestic producers against imported OCTG (amm.com, July 2).




Latest Pricing Trends Year Over Year

Poll

After witnessing the pace of steel plant idlings and worker layoffs during the first half of the year, what is your view of the second half of 2015? (choose one)

No matter what else happens, layoffs and shutdowns, etc., have nearly or essentially stopped for the year.
The environment will change little and the pace of layoffs will continue at a similar rate as the first half of 2015.
The environment will change little yet the pace of layoffs will begin to slow slightly to moderately.
The environment will change little yet the pace of layoffs could exceed the rate seen thus far.
The environment will improve slightly to moderately yet hiring and plant restarts will not resume this year.
The environment will improve slightly to moderately, with hiring and plant restarts commencing.
The environment will improve dramatically yet hiring and plant restarts will still be negligible in comparison.
The environment will improve dramatically yet hiring and plant restarts will only be slight to moderate.
The environment will improve dramatically, with hiring and plant restarts occurring nearly in tandem.


View previous results