Search
AMM.com Copying and distributing are prohibited without permission of the publisher
Email a friend
  • To include more than one recipient, please separate each email address with a semi-colon ';', to a maximum of 5

  • By submitting this article to a friend we reserve the right to contact them regarding AMM subscriptions. Please ensure you have their consent before giving us their details.


L.B. Foster supplies steel for hub

Keywords: Tags  L.B. Foster, steel pipe, Transbay Transit Center, transportation hub, Dan Schrager


NEW YORK — L.B. Foster Co. has supplied 2,600 tons of 36-inch-diameter steel pipe with wall thicknesses between 1.125 and 1.5 inches for use as lateral shoring struts in the excavation of San Francisco’s new Transbay Transit Center.

"More than 160 truckloads of pipe as heavy as 17 tons each were required for the excavation of this signature transit project," said Dan Schrager, senior sales representative for Pittsburgh-based L.B. Foster’s construction products.

The Transbay Transit Center is a multi-billion-dollar regional hub connecting the city to eight Bay Area counties with rail and bus transit systems, the company said.


Have your say
  • All comments are subject to editorial review.
    All fields are compulsory.



Latest Pricing Trends